About our Farm and Goat Farming
Our Dam (cont.): Final Finish
16. March 2005
21. March 2005
The "inner" side of the dam wall is smoothed out
The "back side" of the dam wall is covered with top soil, and the centre (the core) is covered with a layer of gravel to allow vehicles to
drive across the dam wall
..Nutrition
..Fencing
Copyright 2024
Koonac Enterprises